Project specification

Verified part, tooling and inspection details

Part dimensions100 × 80 × 60 mm
Minimum wall thickness0.8 mm
Critical dimensional tolerance±0.05 mm
MaterialPC/ABS
Mould steel / cavities / gating / ejectionS136H · 1+1 cavities · edge gate · direct ejection
Machining equipmentCNC · slow wire EDM · mirror EDM · grinding · milling
Inspection equipmentCMM · 2.5D vision measuring system · profile projector · gauge blocks
Production reference3,000 parts in approximately 4 days after approval
Final quality result98% good part rate
Smart home injection moulding case

Smart Switch Cover

A PC/ABS cover for a smart home control product. Multiple side openings, small internal holes and long bosses required coordinated release, venting and surface finishing.

3D mould structure for a smart switch cover
3D TOOL STRUCTURE1+1 cavity layoutRelease, flow and long boss details were reviewed before steel cutting.
ApplicationSmart home controls
MaterialPC/ABS
Tool steelS136H
Tooling1+1 cavities
Delivery30 days
01 · Customer need and engineering challenge

Engineering a smart switch cover with complex openings and long bosses

The customer required a PC/ABS smart switch cover within a 30 day mould delivery target. The part included multiple side openings, small internal holes and long slender bosses, making release, venting, filling and polishing important to the final appearance and function.

01
Multiple side openingsSide features required coordinated release planning in the mould structure.
02
Small internal holesRestricted air evacuation increased the risk of short shots and trapped air.
03
Long bossesLong internal columns increased sticking risk during ejection.
Production mould
Moulded PC/ABS cover samples
02 · Tooling approach

DFM led tooling with release and venting improvements

TOOL DESIGN

S136H · 1+1 cavities

An edge gate and direct ejection were planned around the cover geometry and internal bosses.

MACHINING ROUTE

Precision detail work

CNC, slow wire EDM, mirror EDM, grinding and milling supported the mould construction and surface detail.

TRIAL FIX

Three trial rounds

Sticking, short shots and weld lines were addressed by increasing draft, enlarging venting and polishing the relevant mould areas.

03 · Result and customer value

Delivered in 30 days and ready for the customer's product launch

The mould was delivered within 30 days. Three trial rounds stabilized release and filling, reaching a final good part rate of 98%. The finished cover assembled successfully into the customer's smart home product.

Customer business value
Supported an on time product launch, reduced schedule risk and provided a stable assembly ready component.
30 daysMould delivery
3Trial rounds
98%Good part rate
A clear path from drawing to production

Discuss a similar tooling project

Share your 3D data, material and delivery target for a practical DFM and mould review.